Customer : Univar
Chemical Industry
City : Valleyfield
Start : 2011
As part of a project to increase the storage capacity of the Valleyfield terminal, FINTEX was mandated to evaluate the installation cost of 6 API 650 tanks of 80 m³ each for the storage of organic solvents. The study consisted in the preliminary design of the tank farm, the obtention of bids from suppliers for major equipment and the preparation the project capital investment cost.
As part of a project to reduce the operation cost of the Valleyfield plant, FINTEX has prepared the preliminary engineering for an integrated system for the production of high purity process water. The mandate was to determine the equipment required for the production of high purity process water, obtain bids for the equipment and prepare the capital investment cost for the project.